Services

The Steps of the Process

  1. The concrete surface is abraded to remove contaminants and create a rough profile for maximum bond to the coating.
  2. All cracks and holes are filled and/or grinded as needed.
  3. The pigmented base epoxy coat is spread using a squeegee and back rolled for even thickness.
  4. While the base coat is still wet, the vinyl flake or quartz aggregate is broadcast into the basecoat and allowed to dry.
  5. The excess aggregate is scraped and vacuumed off and lightly sanded to prepare surface for the polyaspartic top coating.
  6. The polyaspartic top coat is prepared and applied to put the finishing touch on a great-looking, long-lasting, chemical resistant surface. The polyaspartic top coat gives your floor a stronger fade resistant floor system.